PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing footing and foundation forms along column line 6.5 (G-C.7) Facing East (800x600).jpg Installing footing and foundation forms along column line 6.5 (G-C.7) Facing South-East (800x600).jpg Installing metal decking at Derrick -1 3rd Floor Facing South (800x600).jpg Installing metal decking at Derrick -1 3rd Floor Facing South-West (800x600).jpg Metal decking at Derrick -1 3rd Floor Facing South (800x600).jpg
Previous page Metal decking at Derrick -1 3rd Floor Facing South (800x600)
Metal decking at Derrick -1 3rd Floor Facing South (800x600)